information about Fukushima published in English in Japanese media info publiée en anglais dans la presse japonaise
2 Février 2016
January 31st, 2016
http://www.fukuleaks.org/web/?p=15279
IRID has published a new plan to complete phase 2 of the robot containment inspection of unit 1 at Fukushima Daiichi. The initial plan involved dropping the shape changing robot down to the basement level of the containment structure. Due to brackish water and small debris in the water they have opted to not attempt to drop the shape changing robot or another swimming robot down into the lower level.
[…]
Check the fukuleaks website to read the whole article