Overblog
Editer l'article Suivre ce blog Administration + Créer mon blog
Le blog de fukushima-is-still-news

information about Fukushima published in English in Japanese media info publiée en anglais dans la presse japonaise

Camera in No.2 containment vessel working again

January 27, 2017

TEPCO reinserts camera in Fukushima reactor

https://www3.nhk.or.jp/nhkworld/en/news/20170126_31/

 

TEPCO, the operator of the damaged Fukushima Daiichi nuclear plant, has again begun using a camera probe inside the containment vessel of the No. 2 reactor.

Taking pictures of the molten fuel inside is regarded as an important step towards decommissioning the reactors that melted down.

On Tuesday, workers at the plant tried to insert a camera into a pipe leading into the containment vessel.

But the camera got stuck in the pipe's opening. The rubber, which had shrunk due to cold, blocked it.

In a second attempt on Thursday, workers tried to push the camera into the pipe while warming the rubber with thermal material. They were successful.

Footage from the camera shows a black substance adhering to the surface of metal rails in the vessel. The rails will be used as tracks for a robot to do a survey in February.

TEPCO expects the camera may capture footage of molten fuel for the first time since the 2011 meltdown.

 

 

 

Partager cet article
Repost0
Pour être informé des derniers articles, inscrivez vous :
Commenter cet article