information about Fukushima published in English in Japanese media info publiée en anglais dans la presse japonaise
7 Juillet 2014
http://www3.nhk.or.jp/nhkworld/newsline/201407042011.html
Nuclear Watch
Aired on Jul. 4
About the construction of the massive ice wall by TEPCO:
Workers insert pipes that will reach 30 meters into the soil (the wall will be 1,5km long with a pipe every meter, i.e 1,500 pipes). These pipes will surround the reactor buildings and coolant will be inserted, into a giant ice wall which is supposed to stop groundwater from seeping into the buildings.
But the wall will cross a whole network of pipes underneath the reactors and experts fear this will interfere with the freezing process.
ALPS ‘manager: Radiation is damaging the Teflon coating of the equipment …”there are many things we don’t know”.
“The trial and error continues”…