Overblog
Suivre ce blog Administration + Créer mon blog
Le blog de fukushima-is-still-news

Le blog de fukushima-is-still-news

information about Fukushima published in English in Japanese media info publiée en anglais dans la presse japonaise

26/02/2017 Publié depuis Overblog

No decommissioning work for foreigners

February 24, 2017 TEPCO won't let foreign trainees do nuclear decommissioning work https://mainichi.jp/english/articles/20170224/p2a/00m/0na/003000c...

En savoir plus

26/02/2017 Publié depuis Overblog

Keeping an eye on N. Korea

February 26, 2017 Govt. to set up new nuclear monitoring post https://www3.nhk.or.jp/nhkworld/en/news/20170226_13/...

En savoir plus

25/02/2017 Publié depuis Overblog

"A forest of containers" and nowhere to go

February 25, 2017 Fukushima nuclear plant still plagued by tainted water 6 years after meltdowns http://mainichi.jp/english/articles/20170225/p2a/00m/0na/010000c...

En savoir plus

24/02/2017 Publié depuis Overblog

One step forward, two steps backwards

February 24, 2017 Trump backs missile shield against North Korea, pushes upgrades to nuclear arsenal http://www.japantimes.co.jp/news/2017/02/24/national/politics-diplomacy/trump-backs-missile-shield-north-korea-pushes-upgrades-nuclear-arsenal/...

En savoir plus

24/02/2017 Publié depuis Overblog

"Just peeking"

February 23, 2017 Fukushima robots not enough to devise fuel-removal plan for reactor 2: Tepco http://www.japantimes.co.jp/news/2017/02/23/national/pics-fukushima-robots-not-enough-devise-fuel-removal-plan-reactor-2-tepco/#.WK_msPKDmos...

En savoir plus

24/02/2017 Publié depuis Overblog

Nuke integration project delayed

February 23, 2017 Hitachi, Mitsubishi Heavy, Toshiba to delay nuclear integration project http://mainichi.jp/english/articles/20170223/p2a/00m/0na/011000c...

En savoir plus

24/02/2017 Publié depuis Overblog

New robot for No.1 survey

February 24, 2017 Another robot survey to be tried at reactor https://www3.nhk.or.jp/nhkworld/en/news/20170224_09/...

En savoir plus

24/02/2017 Publié depuis Overblog

Oi restart still need local consent

February 23, 2017 EDITORIAL: Local consent needed despite OK to restart Oi nuclear plant http://www.asahi.com/ajw/articles/AJ201702230032.html...

En savoir plus

24/02/2017 Publié depuis Overblog

Governor likely to OK Sendai restart

Governor likely to OK Sendai plant operation https://www3.nhk.or.jp/nhkworld/en/news/20170222_33/ The governor...

En savoir plus

24/02/2017 Publié depuis Overblog

Kashiwazaki-Kariwa: Smoke but no radiation leak (says TEPCO)

February 23, 2017 Smoke emerges at TEPCO's Niigata nuclear plant http://mainichi.jp/english/articles/20170223/p2g/00m/0dm/083000c...

En savoir plus

24/02/2017 Publié depuis Overblog

Crack found at Shimane

February 17, 2017 Crack spotted on Shimane reactor part https://www3.nhk.or.jp/nhkworld/en/news/20170217_01/ The...

En savoir plus

24/02/2017 Publié depuis Overblog

US nukes should stay "top of the pack" (2)

February 24, 2017 Trump wants U.S. nuclear arsenal to be the ‘top of the pack’ http://www.asahi.com/ajw/articles/AJ201702240013.html...

En savoir plus

24/02/2017 Publié depuis Overblog

US Nukes should stay "top of the pack"

February 23, 2017 Donald Trump says US could expand nuclear arsenal to stay ‘top of the pack’ http://www.independent.co.uk/news/world/americas/us-politics/donald-trump-us-president-nuclear-arsenal-weapons-defence-top-of-pack-a7596641.html...

En savoir plus

21/02/2017 Publié depuis Overblog

IItate's evacuees pressured to return (Greenpeace)

Government employees monitor radiation at a day-care center in Iitate in 2011 Fukushima nuclear disaster evacuees...

En savoir plus

21/02/2017 Publié depuis Overblog

TEPCO looking for new business

February 20, 2017 Tepco, Chubu Electric may integrate thermal power biz in 2018 http://www.japantimes.co.jp/news/2017/02/20/business/corporate-business/tepco-chubu-electric-may-integrate-thermal-power-biz-2018/#.WKrzPvKDmos...

En savoir plus