Overblog
Suivre ce blog Administration + Créer mon blog
Le blog de fukushima-is-still-news

information about Fukushima published in English in Japanese media info publiée en anglais dans la presse japonaise

daiichi nuclear plant

26/11/2015 Publié depuis Overblog

(Just completed) wall to contain radioactive water leaning towards sea

November 25, 2015 Groundwater wall at Fukushima plant leans slightly http://www3.nhk.or.jp/nhkworld/english/news/20151125_37.html...

En savoir plus

21/11/2015 Publié depuis Overblog

New material to save time and money in dealing with contaminated water

November 20, 2015 20.11.2015_No230 / News in Brief Researchers From UK’s Imperial College Aim To Help In Fukushima...

En savoir plus

07/11/2015 Publié depuis Overblog

Still leaking radioactive water

November 6, 2015 Photo Journal: Radioactive water still leaking from Fukushima plant http://mainichi.jp/english/english/newsselect/news/20151106p2a00m0na003000c.html...

En savoir plus

07/11/2015 Publié depuis Overblog

Steel wall seems to be effective

November 5, 2015 TEPCO: Steel barrier reducing radioactivity at sea http://www3.nhk.or.jp/nhkworld/english/news/20151106_02.html...

En savoir plus

31/10/2015 Publié depuis Overblog

New robot

October 29, 2015 Robot for decontaminating high places to be deployed at Fukushima nuke plant A new radioactive...

En savoir plus

30/10/2015 Publié depuis Overblog

Extremely high radiation levels stall checks (No.2)

October 30, 2015 Deadly 9.4 sieverts detected outside Fukushima reactor 2 containment vessel; checks stop http://www.japantimes.co.jp/news/2015/10/30/national/deadly-9-4-sieverts-detected-outside-fukushima-reactor-2-containment-vessel-checks-stop/#.VjOVICt1BLN...

En savoir plus

26/10/2015 Publié depuis Overblog

Steel wall completed

October 26, 2015 Walls to halt tainted groundwater from flowing into sea completed at Fukushima plant http://ajw.asahi.com/article/0311disaster/fukushima/AJ201510260048...

En savoir plus

11/10/2015 Publié depuis Overblog

Highly radioactive deteriorating exhaust pipe may not be priority

October 10, 2015 TEPCO begins examination of Fukushima reactor containment vessel exhaust pipe http://mainichi.jp/english/english/newsselect/news/20151010p2a00m0na007000c.html...

En savoir plus

10/10/2015 Publié depuis Overblog

TEPCO's frozen wall ready in December?

October 10, 2015 Tepco expects to begin freezing ice wall at Fukushima No. 1 by year-end Bloomberg Tokyo Electric...

En savoir plus

06/10/2015 Publié depuis Overblog

Last cover panel removed from No.1 (2)

October 6, 2015 TEPCO removes final canopy panel at damaged Fukushima reactor building THE ASAHI SHIMBUN Tokyo...

En savoir plus

05/10/2015 Publié depuis Overblog

Last cover panel removed from No.1

October 5, 2015 Last ceiling panel removed from Fukushima reactor http://www3.nhk.or.jp/nhkworld/english/news/nuclear.html...

En savoir plus

03/10/2015 Publié depuis Overblog

Where did it go?

September 30, 2015 Fukushima: the World’s Never Seen Anything Like This http://www.counterpunch.org/2015/09/30/the-worlds-never-seen-anything-like-this/...

En savoir plus

02/10/2015 Publié depuis Overblog

Workers needed where robot not good enough

October 2, 2015 TEPCO gets closer to robot probe of No.2 reactor http://www3.nhk.or.jp/nhkworld/english/news/nuclear.html...

En savoir plus

29/09/2015 Publié depuis Overblog

Pumping up rainwater further upstream?

September 29, 2015 Reduction of radioactive rainwater urged at plant http://www3.nhk.or.jp/nhkworld/english/news/nuclear.html...

En savoir plus

29/09/2015 Publié depuis Overblog

Additional tanks still needed

September 29, 2015 TEPCO to install additional storage tanks for contaminated water at Fukushima plant http://mainichi.jp/english/english/newsselect/news/20150929p2a00m0na011000c.html...

En savoir plus