Overblog
Suivre ce blog Administration + Créer mon blog
Le blog de fukushima-is-still-news

information about Fukushima published in English in Japanese media info publiée en anglais dans la presse japonaise

daiichi nuclear plant

28/09/2015 Publié depuis Overblog

Confirmed (2): 70 to 100% fuel likely melted in No.2

September 28, 2015 Study find it likely that 70% of nuclear fuel melted at Fukushima No. 2 reactor http://www.japantimes.co.jp/news/2015/09/28/national/study-find-it-likely-that-70-of-nuclear-fuel-melted-at-fukushima-no-2-reactor/#.Vgj20Jfwmif...

En savoir plus

27/09/2015 Publié depuis Overblog

How effective is Fortum's processing system?

September 22, 2015 22.09.2015_No187 / News in Brief Fortum Wins New Order For Fukushima Ion Exchange Materials...

En savoir plus

26/09/2015 Publié depuis Overblog

Confirmed: 70 to 100% fuel likely melted in No.2

September 27, 2015 Researchers: More than 70% of No. 2 reactor's fuel may have melted http://ajw.asahi.com/article/0311disaster/fukushima/AJ201509270023...

En savoir plus

21/09/2015 Publié depuis Overblog

No standards for radioactive rainwater...

September 20, 2015 Radioactive rain releases can’t be curbed due to lack of laws: NRA http://www.japantimes.co.jp/news/2015/09/20/national/radioactive-rain-releases-cant-curbed-due-lack-laws-nra/#.Vf7JQZfwmid...

En savoir plus

21/09/2015 Publié depuis Overblog

New robot for Fukushima Daiichi

September 21, 2015 New advanced robot to join cleanup effort at Fukushima No. 1 nuclear plant A new robot set to...

En savoir plus

14/09/2015 Publié depuis Overblog

Treated contaminated water dumped into sea

September 14, 2015 TEPCO releases first batch of decontaminated Fukushima groundwater to sea http://ajw.asahi.com/article/0311disaster/fukushima/AJ201509140069 By...

En savoir plus

11/09/2015 Publié depuis Overblog

Radioactive rainwater flows into sea

September 11, 2015 Rainwater overflows from Fukushima plant http://www3.nhk.or.jp/nhkworld/english/news/20150911_22.html...

En savoir plus

10/09/2015 Publié depuis Overblog

Groundwater Release Plan

Groundwater Release Plan : Nuclear Watch video http://www3.nhk.or.jp/nhkworld/english/news/nuclearwatch/20150909.html...

En savoir plus

09/09/2015 Publié depuis Overblog

Water to be released into sea

September 8, 2015 Groundwater to be released into the sea on Monday http://www3.nhk.or.jp/nhkworld/english/news/nuclear.html...

En savoir plus

08/09/2015 Publié depuis Overblog

Removing third roof panel off No.1

September 8, 2015 Third ceiling panel removed from Fukushima reactor Sep. 8, 2015 - Updated 06:41 UTC+2 http://www3.nhk.or.jp/nhkworld/english/news/nuclear.html...

En savoir plus

05/09/2015 Publié depuis Overblog

700,000 tons of radioactive water

September 5, 2015 Nearly 700,000 tons of radioactive water stored at Fukushima plant http://ajw.asahi.com/article/0311disaster/fukushima/AJ201509050017...

En savoir plus

04/09/2015 Publié depuis Overblog

New robot to decontaminate No3. building

September 3, 2015 Robot to decontaminate reactor building http://www3.nhk.or.jp/nhkworld/english/news/20150903_30.html...

En savoir plus

03/09/2015 Publié depuis Overblog

Cooling restarted in No.3 pool

September 3, 2015 TEPCO resumes cooling in No.3 spent fuel pool http://www3.nhk.or.jp/nhkworld/english/news/20150903_29.html...

En savoir plus

03/09/2015 Publié depuis Overblog

Oceans can't complain

September 3, 2015 TEPCO begins pumping up groundwater before dumping in ocean http://mainichi.jp/english/english/newsselect/news/20150903p2g00m0in042000c.html...

En savoir plus

02/09/2015 Publié depuis Overblog

Final report on Fukushima disaster (4)

September 1, 2015 Assumption of safety behind Fukushima debacle: final IAEA report http://www.japantimes.co.jp/news/2015/09/01/national/assumption-safety-behind-fukushima-debacle-final-iaea-report/#.VeaWPJfwmic...

En savoir plus